Skip to main content
HHI Builders
Built-in bar nook with navy cabinets, glass-front doors, wine fridge, and patterned backsplash

Hilton Head Plantation Kitchen and Dry Bar

Two quartz finishes, an induction cooktop with a downdraft, and a dry bar with a wine cooler.

Book a Call

Project facts

Community
Hilton Head Plantation
Type of work
Kitchen
Timeline
9 weeks
Budget range
$125K to $150K
Services performed
Kitchen Remodeling

Project Key Features

  • Quartz island in a contrasting pattern, with a white quartz perimeter

  • Custom glass cabinet doors and custom shelves

  • Cabinet crown molding

  • 30" induction cooktop with a telescoping downdraft

  • Double wall ovens and a microwave drawer

  • Dry bar with a dual-zone wine cooler

  • Mosaic backsplash with a custom-matched blue grout

  • Wallpaper accent

  • Framing removed to open the layout

  • Cabinets installed in about three days

Design · Build · Enjoy

Design

The kitchen layout was closed in and there was no dedicated bar space.

This project rebuilt the kitchen and added a dry bar, removing framing to improve the layout.

The two-tone quartz, glass doors and tile were selected during design.

Build

Cabinets went in over about three days. The downdraft venting was completed after the appliances were set.

Enjoy

A contrasting island and white perimeter make the kitchen feel bright. The downdraft keeps sight lines open, and the dry bar gives entertaining its own station.

See Projects on Map

Opens the map with Hilton Head Plantation highlighted.

Ready to start yours?

Start with a 15-minute intro call. No pressure, no obligation: just a straight conversation about what you have in mind.