
Project facts
- Community
- Queens Grant, Palmetto Dunes
- Type of work
- Bath
- Timeline
- About 4 weeks
- Budget range
- $75K to $100K
- Services performed
- Bathroom Remodeling
Project Key Features
Mineral-green tile shower walls in one bath and wave-textured tile in the other
Hex mosaic shower floors and tiled niches
24" linear shower drain
Handshower in each shower
Frameless glass shower doors
48" wall-mounted vanity with an integrated top
Travertine-look 12x24 floor tile
Framed mirrors
A rotted dividing wall reframed
Block walls behind the showers furred out so the niches would fit
Design · Build · Enjoy
Design
Both baths were original. A dividing wall had rot, and the solid block behind the showers left no room for niches.
Both bathrooms in this villa were rebuilt from the studs, in a building where the plumbing and walls needed extra attention.
A separate design contract finalized tile and fixtures before construction.
Build
Construction ran in April 2026.
Enjoy
Color, texture and frameless glass make two small baths feel custom. Fixing the hidden wall and block issues made the result last.
Ready to start yours?
Start with a 15-minute intro call. No pressure, no obligation: just a straight conversation about what you have in mind.







