Sea Pines Condo Remodel with Bunk Room
Shiplap ceilings, Taj Mahal quartzite and a custom bunk room in a top-floor condo.
Book a CallProject facts
- Community
- Sea Pines
- Type of work
- Condo/Villa
- Timeline
- About 19 weeks
- Budget range
- $250K to $300K
- Services performed
- Condo & Villa Remodeling
Project Key Features
Taj Mahal quartzite on the kitchen and the wet/dry bar
Shaker cabinetry with a shiplap-sided island, light rail and crown
Shiplap ceilings with 6" crown through the main living area
Board-and-batten walls
Custom built-in bunk beds in the second bedroom
Coastal-toned LVP throughout
Primary shower with a river-pebble floor, quartz bench and curb, large-format wall tile and an enlarged niche
Guest shower with a basketweave tile floor
Champagne-bronze fixtures, GE Profile appliances and a beverage drawer
New balcony and front doors, with the balcony threshold waterproofed
Design · Build · Enjoy
Design
The condo had closed-off rooms, low ceilings in the baths and hallway, original finishes, and wiring found during demolition that did not meet code.
This whole-unit remodel covered the entry, hallway, kitchen, dining, living room, both bedrooms and both bathrooms. Ceilings were raised in the baths and hallway, and some walls were removed to open the plan.
Layout, finishes and the bunk room were designed and priced before construction.
Build
Work began in December 2025. The team agreed a code-compliant electrical fix on site with the Town's inspector, and moved plumbing to fit a larger shower niche. The client punch list was complete in April 2026.
Enjoy
Opening walls, raising ceilings and running shiplap across the main space make the condo feel larger. Quartzite, bronze fixtures and a built-in bunk room make it work for family weekends.
Ready to start yours?
Start with a 15-minute intro call. No pressure, no obligation: just a straight conversation about what you have in mind.