Sea Pines Primary Suite and Kitchen Remodel
A rebuilt primary bath with brushed-brass fixtures, plus kitchen, dining and primary bedroom updates.
Book a CallProject facts
- Community
- Sea Pines
- Types of work
- Bath · Kitchen
- Timeline
- About 17 weeks
- Budget range
- $175K to $200K
- Services performed
- Bathroom Remodeling
Project Key Features
Primary bath with Kohler fixtures in brushed modern brass
Lighted makeup mirror and lit shower niche
New knee wall and niche framing in the shower
Pocket door into the bath
New tile floor
A new chandelier in the dining room, relocated to center the space
Ceiling cracks repaired and ceilings repainted, with updated lighting
A new bonus closet
Recessed lighting retrofit to LED
Driveway power-washed at completion
Design · Build · Enjoy
Design
The primary bath was original, the ceilings had cracking, and the dining light was off-center.
This project covered the kitchen, dining room, primary bedroom, primary bath and a bonus closet, along with exterior cleanup.
Our designer stayed involved through construction to fine-tune lighting and finishes.
Build
Demolition began in June 2025 and work was complete in October 2025.
Enjoy
Brass fixtures, lit niches and a lighted mirror give the primary bath a boutique feel. Fixing the ceilings and lighting cleaned up the rest of the home.