Skip to main content
HHI Builders
Kitchen with white cabinets, gold hardware, island sink, and stainless steel appliances

Palmetto Dunes Kitchen and Home Remodel

A new kitchen and wet bar, hardwood stairs, and three rebuilt baths.

Book a Call

Project facts

Community
Palmetto Dunes
Type of work
Whole Home
Timeline
About 18 weeks
Budget range
$250K to $300K
Services performed
Whole Home Remodeling

Project Key Features

  • Kitchen with full-height pantry cabinets, 42" uppers and crown molding

  • Cambria quartz countertops

  • Wet bar with its own sink and faucet

  • Under-cabinet lighting and new outlets at the island

  • Engineered framing with LVL beams where walls changed

  • LVP flooring over a new subfloor overlay for a flat, solid floor

  • Hardwood stair treads

  • Custom solid-wood shelving and pocket doors

  • Three bathrooms rebuilt with new vanities, lighting and tile showers

  • Electrical brought up to current code

Design · Build · Enjoy

Design

The home had original cabinetry, uneven floors and electrical that no longer met code.

This remodel covered the kitchen, dining, living room, laundry, Carolina room, three bedrooms and three bathrooms. Structural framing was engineered where walls changed. The home's electrical was brought up to current code as part of the work.

Layout, structure and selections were set before construction, including the engineered beam work.

Build

Demolition began in December 2022 and final punch was complete in April 2023.

Enjoy

A level new floor, an upgraded kitchen with a wet bar, and hardwood stairs give the home a finished, connected feel. The code updates make it safe for the long term.

See Projects on Map

Opens the map with Palmetto Dunes highlighted.

Ready to start yours?

Start with a 15-minute intro call. No pressure, no obligation: just a straight conversation about what you have in mind.