Port Royal Whole Home Refresh
New hardwood, a new kitchen and two baths in 10 weeks, and a new deck later on.
Book a CallProject facts
- Community
- Port Royal
- Type of work
- Whole Home
- Timeline
- About 10 weeks
- Budget range
- $300K to $350K
- Services performed
- Whole Home Remodeling
Project Key Features
Circular-sawn solid hardwood flooring
Grasscloth wallpaper and board-and-batten walls
Kitchen with an upgraded tile backsplash and upgraded countertops
New kitchen faucet and sink, and a French-door refrigerator
Two bathrooms updated
Upgraded cabinet hardware
Refinished storm door with new hardware
Later phase: Fiberon composite deck with TimberTech railings
Later phase: a new outdoor shower platform and walkway
Later phase: rotted floor joists replaced under the new deck
Design · Build · Enjoy
Design
The home had worn flooring and dated finishes. The original deck framing had rot.
The first project updated the entry, kitchen, dining, living room, laundry, three bedrooms and two bathrooms. The owners came back in 2025 for a new deck, walkway and outdoor shower.
Finishes were selected up front, with upgrades priced before work began.
Build
Interior work ran from September to December 2023. The deck phase ran from August to September 2025.
Enjoy
New hardwood and textured wall finishes warm up the whole house. A composite deck and outdoor shower finished the outdoor living.